Client: A Global Top-tier Shipyard (Confidential)
Challenge: High distortion in hull block welding and labor costs accounting for 35% of expenses.
IKING Solution:
Customized Twin-Wire Submerged Arc Welder (IK-2000) with dual-edge drive, reaching 550mm/min welding speed for box girders.
Automated Arc Guidance System with pneumatic adjustment, limiting misalignment to ±1mm.
Results:
✔ 60% higher welding efficiency and 28% lower labor costs.
✔ DNV-GL certified, securing contracts for 12 new vessels.
"Asia’s first 10,000-TEU ship built with twin-arc technology." — Chief Project Engineer